Cómo importar paneles solares de China en 2026: guía práctica para compradores
Errores de certificación, cálculo de contenedores y tres preguntas que conviene hacer a cada fábrica antes de enviar un anticipo.
Solar is one of the highest-velocity categories we export, and also one where a small mistake in certification can cost you an entire container at customs. This guide covers what actually matters.
First, match the standard to the destination, not to the cheapest quote. Europe needs IEC 61215 / 61730 plus CE; Australia needs CEC listing; the US market has its own anti-dumping duties and UL path. Ask the factory which market their panel line is actually built for.
Second, do the container math before the unidad math. A 40HC fits roughly 23-24 pallets of 550W panels; your landed cost per watt changes a lot with stacking and loading strategy. Ask for the factory's actual loading diagram.
Third, verify production capacity honestly. Ask for last mes's shipping records, not projected capacity. A factory that ships 2MW a semana can't suddenly do 10MW for you without subcontracting risk.
Every order we ship includes the panel datasheet, the batch test report and loading photos. If a factory won't show you those three before payment, that is your answer.
¿Necesita abastecerse de esto?
Cuéntenos qué necesita y responderemos en un día laborable.
Contacto
Cuéntenos qué necesita comprar
Envíe su RFQ y reciba en un día laborable una cotización consolidada, MOQ y plazo de entrega.